Description

Even before a finished design was ready or approved, Hitler, in November 1942, ordered that 5 Mäuschen were to be built and a timetable set by Wa Prüf 4 to achieve this. Turret and hull drawings were to be ready and approved by March 1943 and then 5 vehicles built within just 6-7 months- an ambitious and unrealistic schedule, as this also called for trials by 5th May 1943. The Heereswaffenamt (Army Ordnance Department) arranged for Colonel Haenel to help ensure timetables for the Maus were adhered to by going from firm to firm to press them to meet production requirements and, if necessary, assess severe penalties for missing deadlines.



Article: https://tanks-encyclopedia.com/ww2/na...



If you liked this video, please consider donating on Patreon or Paypal! 


Patreon: https://www.patreon.com/tankartfund


Paypal: https://www.paypal.me/tankartfund



An article by Andrew Hills 


Narrated by @ConeOfArc  


Edited by Séraphin Panlion 


Sound edited by Gabe The Tanker

Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

080 Panzerkampfwagen VIII Maus Part 2 With @ConeOfArc | The Definition of Inefficient

080 Panzerkampfwagen VIII Maus Part 2 With @ConeOfArc | The Definition of Inefficient

Various authors